top of page
Industrial room with tiled brown floor, white walls, and ceiling lights

Facilities & Project Management – Expert Team, Based near Cardiff & Covering the UK

Skilled professionals. Over ten years. End-to-end project delivery.

Call now for project management expertise!

Turnkey Solutions For Complex Projects

Specialists In Pharmaceutical Environments

Friendly Team With Strong Client Focus

Comprehensive Facilities Project Management

AFM SW LTD has been delivering tailored project solutions for over a decade. Based near Cardiff, we specialise in managing complex projects across the pharmaceutical, life science, and microchip sectors. Our expertise spans everything from laboratory design to high-potency packaging facilities and external construction builds. Using a turnkey approach, we manage every stage with meticulous attention to detail. Whether creating contained manufacturing environments or transforming fallow spaces into fully operational facilities, get in touch to see how we can bring your vision to life with precision and care.

A side-by-side comparison shows a room transformation.

Laboratory Remediation

Over the past eight years, AFM has developed a strong and trusted partnership with a leading pharmaceutical company in Cardiff. This project involved the complete deconstruction and refurbishment of one of their laboratory areas.

 

The work began with the removal of all existing fixtures, fittings, floor and wall finishes, and ceiling tiles and grids. Waste materials were carefully segregated, with recyclables sent for reprocessing. The deconstruction was completed within a month, fully complying with health and safety legislation. Risk assessments were conducted beforehand, and temporary dust barriers were installed to protect other building occupants and reduce post-deconstruction cleaning.

 

AFM SW LTD then constructed all internal partitions using metal studs and plasterboard, forming doors, internal screens, and pass-through hatches. Lifting equipment and scaffold towers ensured safe handling of materials. Electrical and data cabling was installed concurrently, meeting the client’s specifications.

 

The team installed Altro Whiterock wall cladding in all areas requiring hygienic, easy-to-clean surfaces. Dado trunking was fitted for worktop power and data supply, and Polyflor flooring was laid by approved installers.

 

Next, the ceiling grid, tiles, lighting, emergency lighting, fire detectors, air conditioning, and sensors were installed in compliance with building and fire regulations. Internal doors, screens, and a specialist laboratory transfer hatch were also fitted.

 

Finally, all laboratory fixtures and equipment were installed and commissioned to the client’s requirements. The project was delivered on time, on budget, and to the highest standards, resulting in a fully functional, compliant, and high-performance laboratory space.

Split image showing an office renovation: Left side 'Before' with an unfinished space, exposed beams, and tools

Argyle House Office Re-Fit

AFM SW LTD has built a strong partnership with a leading companies.

This project involved the full deconstruction and refurbishment of one of our clients office areas.

 

All existing fixtures, fittings, floor and wall finishes, and ceiling tiles were removed, with waste segregated and recyclables reprocessed. Temporary dust barriers were installed to protect other occupants and reduce post-deconstruction cleaning.

 

AFM SW LTD constructed internal partitions with metal studs and plasterboard, creating doors, screens, and kitchen areas requested within the existing office footprint.

 

The team completed ceiling grids, lighting, emergency systems, fire detectors, air conditioning, and kitchen areas. All fixtures and fittings were installed and commissioned to specification. The project was delivered on time, on budget, and to the highest safety and compliance standards.

Start Your Project Today

Call now to discuss your facilities project management needs.

Contact Us

Unit 8 Riverside Park, Bedwas, Caerphilly, CF83 8XL

Opening Hours

Monday – Friday: 08:00 - 16:30

Saturday - Sunday: Closed

Follow Us

  • Facebook
  • GOOGLE MAP
  • LinkedIn
  • X
  • Instagram
  • Tiktok
Find us on Yell

Terms of Use | Privacy & Cookie Policy | Trading Terms

© 2026 The content on this website is owned by us and our licensors. Do not copy any content (including images) without our consent.

AFM (SW) LIMITED, registered as a limited company in England and Wales under company number: 09810291.

Registered Company Address: Unit 8 Riverside Park Bedwas House Industrial Estate, Bedwas, Caerphilly, Cardiff, CF83 8XL.

bottom of page